翻訳と辞書 |
Healy Clean Coal Project : ウィキペディア英語版 | Healy Clean Coal Project
Healy Clean Coal Project is a clean coal technology demonstration program consisting of a coal fired electrical power station located in Healy, Alaska in Denali Borough. The project was a demonstration of the TRW Clean Coal Combustion System and the Babcock and Wilcox/Joy Spray Dryer Absorber (SDA) System designed to reduce oxides of nitrogen (NOX) and sulfur dioxide (SO2) emissions while burning a variety of coal types, including waste coal. The project constructed a plant adjacent to Golden Valley Electric Association (GVEA) 25 MW coal plant Healy Unit 1. Construction occurred from 1995-1997 at a cost of around $300 million. The facility operated briefly following its construction as part of the demonstration program, but has been shut down since 2000.〔(Alaska's Wild Resource Web: Healy Coal Plant #2 )〕 The research project is considered "complete" by the Department of Energy. The plant is being sold to the GVEA to resume power production in 2012.〔 ==Costs== According to Golden Valley Electric Association (GVEA) the facility cost around $300 million, with the United States Department of Energy contributing $120 million, the Alaska Legislature contributing $25 million, the Alaska Industrial Development and Export Authority (AIDEA) contributing $150 million and both GVEA & Usibelli Coal Mine contributing $10 million in addition to in-kind contributions.〔(Golden Valley Electric Association (GVEA) HCCP page )〕
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Healy Clean Coal Project」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|